
Netherlands-based SeaOwls and Norwegian shipyard Ulstein have launched a pioneering heavy lift jack-up vessel design concept, the Soul. The cruciform structural lay-out is claimed to make the patent-pending solution more than 10 per cent lighter than conventional jack-up vessel designs, yet, all loading and installation operations can be performed without the need of ballast water.
In combination with a high capacity crane, the SOUL enables operators to take the next step in developing offshore wind farms. The concept aims to install the next generation wind turbines (10-12 MW) in the same time frame as currently used for installing 6-8 MW units, a significant efficiency gain over any jack-up vessel design currently available in the market.
Continue reading “SeaOwls and Ulstein conceive ballast water free heavylift jack-up concept”